New Mexico Wind Energy Center to open this fall

Publication Date:

Sandia news media contact

Chris Burroughs
coburro@sandia.gov
505-844-0948

ALBUQUERQUE, N.M. — New Mexico’s most ambitious wind farm, called the New Mexico Wind Energy Center, recently started producing electricity for the Public Service Company of New Mexico, the state’s largest electric and gas utility. The center, the world’s third-largest wind generation project, will officially be dedicated Oct .1.

Located 170 miles southeast of Albuquerque and 20 miles northeast of Fort Sumner, the wind center sits on 9,600 acres of private and state-owned land.

The center consists of 136 turbine towers, each measuring 210 feet in height with turbine blades measuring 110 feet. It will have a peak output of about 200 megawatts of electricity, or about 1.5 megawatts per turbine. The turbines require 8 mph winds to produce electricity and will continue to produce electricity in winds up to 55 mph. The center is expected to produce enough electricity to supply 94,000 average-sized New Mexico homes.

Florida-based FPL Energy owns and manages the Wind Energy Center; PNM will purchase all of its output.

Return to Sandia researchers seek ways to lower the cost of wind energy

See: Aeroelastic tailoring expected to increase life of blades

Sandia technical contact: Tom Ashwill, tdashwi@sandia.gov, (505) 845-8457

 

Sandia National Laboratories is a multimission laboratory operated by National Technology and Engineering Solutions of Sandia LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. Sandia Labs has major research and development responsibilities in nuclear deterrence, global security, defense, energy technologies and economic competitiveness, with main facilities in Albuquerque, New Mexico, and Livermore, California.

Sandia news media contact

Chris Burroughs
coburro@sandia.gov
505-844-0948